Foot-Mounted Electric Wire Rope Hoist DSWHF-C (4/1 Rope Reeving)

Product Description

Foot-Mounted Electric Wire Rope Hoist DSWHF-C
- Dawson Group Ltd. - China Manufacturer, Supplier, Factory
      

Model Capacity
ton
Lifting Speed
m/min
Lifting Motor
kw
Work Group
FEM/ISO
L2(mm) A mm A0 mm
Single Speed Dual Speed
DSWHF-C032 3.2 3.6 3.6/1.2 3 3/1 1Am/M4 350 535 485 395
DSWHF-C063 6.3 3.5 3.5/0.8 4.5 4.5/1.1 380 600 520 430
DSWHF-C100 10 3.8 3.8/0.9 7.5 7.5/2.0 460 645 588 468
DSWHF-C160 16 4 4/1 13 13/3.4 520 620 720 540
DSWHF-C200 20 3.2 3.2/0.8 13 13/3.4 520 620 720 540


Model B H min L3 D S Dimension
(mm)
Lifting height(H)
mm mm mm mm mm 6m 9m 12m 15m
DSWHF-C032 323 531 120 169 0.0174H L0 770 978 1186 1394
L1 925 1133 1341 1549
DSWHF-C063 358 619 134 185 0.0182H L0 812 1030 1248 1466
L1 986 1204 1422 1640
DSWHF-C100 393 689 161 209 0.0191H L0 899 1128 1357 1586
L1 1101 1330 1559 1788
DSWHF-C160 472 760 176 243 0.0194H L0 955 1188 1421 1654
L1 1201 1434 1667 1900
DSWHF-C200 472 760 176 243 0.0194H L0 955 1188 1421 1654
L1 1201 1434 1667 1900

Welcome to buy the newest and competitive price DAWSON Foot-Mounted Electric Wire Rope Hoist DSWHF-C (4/1 Rope Reeving) from our factory. We're one of the leading China manufacturers and suppliers, offering you the wholesale service and the OEM service at a discount. With CE certification, our products made in China in stock are high in quality and low in price. Please be free to get the free sample from us.

 

For further information, please contact us. Email:info@dawson-group.com


Electric Wire Rope Hoist Crane Fittings:




A wire rope hoist is a hoist that utilizes wire rope as the lifting medium. It is often powered electrically or pneumatically. This lifting device is made up of a rope storage drum, motor(s), gear box and braking system, and is suspended from a monorail or bridge beam(s) by means of a trolley. It may also be stationary mounted. 
A crane is a machine used for lifting and lowering a load, and moving it horizontally. A crane's drives may be manual, powered or a combination of both. Cranes are typically used when there is insufficient (or intermittent) flow volume such that the use of a conveyor cannot be justified. They provide more flexibility in movement than conveyors, and less flexibility in movement than industrial trucks. Loads handled by cranes are more varied with respect to their shape and weight than those handled by a conveyor. Most cranes utilize hoists for vertical movement, although manipulators can be used if precise positioning of the load is required.

 

Many different types of cranes are used for material handling applications. These include overhead cranes as well as cherry picker type boom lifts, mobile and self-propelled cranes, straddle and counterbalanced (cantilevered) cranes. Portable and mobile floor cranes can be equipped with fixed or telescopic booms as well as mast rotation when equipped with outriggers. Lifting can be performed with the boom itself or a winch operated cable lift. 
Selection Criteria

 

The size of the hoist is determined by the load spectrum, average operating time, safe working load and rope revving.

 

1. What are the operating conditions ?
2. What is the specified safe working load ?
3. To what height must the load be lifted ?
4. What is the required lifting speed ?
5. Do the loads need to be lifted and lowered with great accuracy ?
6. Is horizontal load travel necessary ?
7. How the hoist to be controlled ?
Duty Factor Mean Effective Loads Average operating time per day in hours
Light Duty   K0.125
Hoist units which are usually subject to very small loads and in exceptional cases only to maximum loads
2 2-1 4-8 8-16
Medium Duty   0.125<k0.25
Hoist units which are usually subject to small loads but rather often to maximum loads
1 1-2 2-4 4-8
Heavy Duty   0.25<k0.5
Hoist units which are usually medium loads but frequently to maximum loads
0.5 0.5-1 1-2 2-4
Very Heavy Duty   0.5<k1
Hoist units which are usually subject to maximum or almost maximum loads
0.25 0.25-0.5 0.5-1 1-2
Working Group ISO M3 M4 M5 M6
FEM 1Bm 1Am 2m 3m
The average operating time per working day is estimated or calculated as follows:
                                     
    2  × average hook path(m)  × number of cycles/hour  × number of working time/day
Operating time/day=  ------------------------------------------------------------------------------------------------------------
                                                                                  60 ×lifting speed(m/min)

Application of related products:



Product Inquiry

European Electric Hoist Double Girder Overhead Crane

European Electric Single Girder Overhead Crane

European Style Double Girder Hoisting Mechanism

Low Headroom Steel Wire Rope Hoist (Single Girder)

DS-NX Light Weight Hanging Type Hoist, Electric Wire Rope Hoist