DS-HSG-B300D-DS-HSG-B500D DS-HSG-B300D1-DS-HSG-B500D1 AC Push Electric Wire Rope Hoist for Mine Lifting with CE Approval
Features:
It can be used for mine lifting, motor with insulation B, protection class is IP54. with thermal protection device. Working rate is S3-30%,20min.
Technique parameter
APPLICATIONS:
Mini winch with built – in safety devices easy control of lifting for a wide range of applicability for warehouse storage areas, factories, house area, construction sites, job sites and plumbing.
Model | Rated capacity (kg) | Lifting height (m) | Lifting speed (m/min) | Voltage (V) | Cable diameter (mm) | Frequency (Hz) | Packing size(mm) | G.W./ N.W.(kg) |
DS-HSG-B300D | 300 | 24 | 21 | AC 110/220/230/240 | φ6 | 50/60 | 800×340×540 | 58/56 |
DS-HSG-B400D | 400 |
DS-HSG-B500D | 500 | 16 | φ7 | 62/60 |
DS-HSG-B300D1 | 300 | 28 | AC 230/380/440 | φ6 | 58/56 |
DS-HSG-B400D1 | 400 | 21 | 790×308×568 |
DS-HSG-B500D1 | 500 | φ7 | 800×340×540 | 62/60 |
Welcome to buy the newest and competitive price DAWSON AC Push Electric Wire Rope Hoist for Mine Lifting with CE Approval from our factory. We're one of the leading China manufacturers and suppliers, offering you the wholesale service and the OEM service at a discount. With CE certification, our products made in China in stock are high in quality and low in price. Please be free to get the free sample from us.
For further information, please contact us. Email:info@dawson-group.com
Hot Tags: AC push electric hoist, push electric wire rope hoist, electric hoist with CE approval, wire rope hoist for mine lifting, push electric hoist, electric hoist supplier China, AC electric hoist, AC electric wire rope hoist, push electric hoist for lifting, electric hoist China supplier, electric hoist China manufacturer, electric hoist China factory, electric hoist China exporter, wholesale electric hoist, low price electric hoist, electric hoist in stock, electric hoist OEM Electric Wire Rope Hoist Crane Fittings:
A wire rope hoist is a hoist that utilizes wire rope as the lifting medium. It is often powered electrically or pneumatically. This lifting device is made up of a rope storage drum, motor(s), gear box and braking system, and is suspended from a monorail or bridge beam(s) by means of a trolley. It may also be stationary mounted.
A crane is a machine used for lifting and lowering a load, and moving it horizontally. A crane's drives may be manual, powered or a combination of both. Cranes are typically used when there is insufficient (or intermittent) flow volume such that the use of a conveyor cannot be justified. They provide more flexibility in movement than conveyors, and less flexibility in movement than industrial trucks. Loads handled by cranes are more varied with respect to their shape and weight than those handled by a conveyor. Most cranes utilize hoists for vertical movement, although manipulators can be used if precise positioning of the load is required.
Many different types of cranes are used for material handling applications. These include overhead cranes as well as cherry picker type boom lifts, mobile and self-propelled cranes, straddle and counterbalanced (cantilevered) cranes. Portable and mobile floor cranes can be equipped with fixed or telescopic booms as well as mast rotation when equipped with outriggers. Lifting can be performed with the boom itself or a winch operated cable lift.
Selection Criteria
The size of the hoist is determined by the load spectrum, average operating time, safe working load and rope revving.
1. What are the operating conditions ?
2. What is the specified safe working load ?
3. To what height must the load be lifted ?
4. What is the required lifting speed ?
5. Do the loads need to be lifted and lowered with great accuracy ?
6. Is horizontal load travel necessary ?
7. How the hoist to be controlled ?
Duty Factor | Mean Effective Loads | Average operating time per day in hours |
Light Duty | | K≤0.125 Hoist units which are usually subject to very small loads and in exceptional cases only to maximum loads | ≤2 | 2-1 | 4-8 | 8-16 |
Medium Duty | | 0.125<k≤0.25 Hoist units which are usually subject to small loads but rather often to maximum loads | ≤1 | 1-2 | 2-4 | 4-8 |
Heavy Duty | | 0.25<k≤0.5 Hoist units which are usually medium loads but frequently to maximum loads | ≤0.5 | 0.5-1 | 1-2 | 2-4 |
Very Heavy Duty | | 0.5<k≤1 Hoist units which are usually subject to maximum or almost maximum loads | ≤0.25 | 0.25-0.5 | 0.5-1 | 1-2 |
Working Group | ISO | M3 | M4 | M5 | M6 |
FEM | 1Bm | 1Am | 2m | 3m |
The average operating time per working day is estimated or calculated as follows:
2 × average hook path(m) × number of cycles/hour × number of working time/day
Operating time/day= ------------------------------------------------------------------------------------------------------------
60 ×lifting speed(m/min)
Production and Equipment:
Application of related products:
Factory & Package Show: