Tower Crane Safety Use Management Approach

Views: 1    

 A tower, purchase (rent)
 
1. The tower to purchase must have effective production license of professional manufacturers to buy, and the manufacturers to provide the quality certificate, high strength bolt connection ZhiBaoShu, lifting rope ZhiBaoShu and other general parts ZhiBaoShu tower and the instruction for use technology material.
 
2. Rent external tower: (1) must sign a written lease agreement, the agreement between the parties must build official seal unit, do not allow to private, soho rent; (2) the machine must be good in tower, without any privately behavior modification, safety device should be complete, life not more than five years; (3) the lessor must provide crane production license, the factory certificate (the original) tower and use the description and the competent department qualified report.
 
3. Purchase second-hand tower shall determine: (1) life not more than three years; (2) the safety device is complete, the machine condition good; (3) the certificate (the original) and relevant technical data is complete; (4) manufacturers over the close or not carry industry.
 
4. The country has already banned purchase obsolete, technology behind the tower (TQ60, TQ80 tower, QT16, QT20, QT25 mast type tower), and has shut down or the manufacturers over the tower.
 
Second, installation tower
 
1. Before installation or remove tower, must be the maintenance (record) : (1) by machine administrator, security officer organization, driver, the captain mechanic of tower of high strength bolt, each connected steel structure welding line, pin shaft, wire rope, and safety device, roof up device and so on one important parts examined carefully, found hidden trouble, timely repair (change) eliminated; (2) after the check, it is necessary to steel structure tower to remove rust and corrosion treatment; (3) all pin shaft, bolt connection with oil maintenance, had used are not allowed to repeat the split cotters use.
 
2. Rent and installing new purchase, such as by the units for installation: (1) must sign a written agreement installation, clear bilateral responsibility, cover both sides, unit's cachet; (2) the installation unit must provide enterprise effective crane installation or copies of the original license, copy must indicate installation site, the enterprise stamp (last); (3) installation unit must provide installation personnel of accountant of the original.
 
3. High strength bolt connection standard quarter use:
 
(1) all day every Angle the standard of joint bolt a tower, each installation, the foundation's day and above two sections only a total of 12 high strength bolt connection must use new bolts, and brush on use of color, the first green paint brush, the second yellow paint brush, brush red paint the third time, the third time after use scrap destroyed;
 
(2) the new purchase criteria that day high strength bolt connection, should brush on number of USES standard color paint, strict control, ban extended use.
 
(3) for existing confirmed that the repeated use three times or more high strength bolt connection must be given a scrap destroyed;
 
4. In the tower before installation, found that steel structure (standard section, arm, and the arm, sets of flat after frame) serious corrosion (including the important parts of the weld), deformation or running machine condition is poor, cannot ensure the safe use of normal, should organize the relevant technical personnel to the scene was measured verification, it is strictly prohibited to the installation and use of adventure.
 
5. Installation tower must prepare a written plan, it is in the level of technology after examination and approval, can implement.
 
6. Tower should be in strict accordance with the basic construction drawing the manufacturer to make to demand, the basement bolt configuration should have passed the examination report material, crane tower before installation should provide take cover engineering acceptance record and concrete foundation inspection qualified report. Heavy pressure must be of the tower concrete precast block, banned the use of brick. To lifting point has been worn, concrete cracking concrete press block should stop using.
 
7. Into the construction site of the homework personnel must go through security technical clarificaiton education, wear a helmet, more than 2 M aerial work must wear qualified seat belts, prevent slippery rubber boots on feet, equipped with hat.
 
8. Installation homework personnel should be posts, no drunken homework.
 
9. Install section to set up alert zone, the overhang warning, and have the specialist care.
 
10. Installation QianJi administrator must to make preparations, especially to the hydraulic roof up centers for test, to ensure that normal use, and check all the sling, sling, the wrench, hammers and tools.
 
11. In strict accordance with the requirements of the tower construction manual installation procedures, personnel enough, division of labor to clear, want to have a person for command (machine administrator), the specialist (captain) responsible for operating hydraulic roof up device.
 
12. Roof up before installing, should arm direction along the installation fixed firm, it is strictly prohibited to turn, in time listening to the weather forecast, more than four wind must stop roof up operations.
 
13. Above six high winds and rain and snow should stop hoisting working, and do the safety protective measures.
 
14. Aloft work must will tool on the toolkit, misplaced is allowed, banned thrown down objects.
 
15. Mobile crane industry should be strictly according to the standard requirement, lifting rope, braking equipment shall be in good condition and effective, and it is strictly prohibited to use overload.
 
16, hoisting the object must be binding firm, maintain stable, big arms should care before and after the rope, small, bulk, should use hoisting boxes.
 
17. All the connecting bolts tower, not galvanized the pin shaft must be rust protection, especially the basic part, should adopt strict antirust measures.
 
18. The tower after installation, in the basis of self-inspection and submitted to the competent authority for testing, qualified rear can use listing.
 
19. Remove the tower through inspection, repair, maintenance after the installation of are not, should be properly piled up, storage, avoid water corrosion.
 
Three, tower operation
 
1. Have driver's operation full-time tower, the driver must posts, and a full-time work command holder command. Lifting operation personnel must wear the good protective equipment.
 
2. Homework should have enough work tower site, hoist boom stem ups and downs and rotary radius no obstacle, and at night there must be sufficient lighting equipment.
 
3. Before operation of the surrounding environment must be, driving road, overhead lines, buildings, component and distribution of weight to fully understand the.
 
4. The standard section and large tower before and after a ban on arms hang large publicity slogans and other shelter materials.
 
5. It is strictly prohibited to without manufacturers agreed to change its material on the tower without authorization and facilities or reduce the tower any facilities.
 
6. Maintenance electrician of electric equipment should be installing every day and horn indicator, installing and torque limiter and various travel limit switch protection device for inspection, ensure complete complete, sensitive and reliable. It is strictly prohibited to use spacing device instead of control mechanisms to stop.
 
7. Every day the driver and conductor before operation should check all kinds of sling, sling and hook insurance in good condition, found that immediately eliminate hidden dangers rectification, forbid to work at risk.
 
8. The driver on and off duty every day tower, must check the high strength bolt connection (especially basic parts) and steel structure welding line, each connecting pin shaft (including split cotters), the DongHuaLun, wire rope, and lifting braking equipment, safety device, and other important part (a), found hidden danger in time report or rule out, while it is strictly prohibited to use. Running in the book must be inspected every day records.
 
9. Each week to the standard section connecting bolts is installing a tower, tighten verticality measuring a.
 
10. Tower near overhead transmission lines shall not work, must online by the roadside homework, tower and the level of the hook overhead lines safe distance must be more than 6 m: if you can't guarantee a safe distance, must set safety protection barrier or power construction; Tower in big arms turn scope, can not have announced high voltage lines; Banned in the high tension line electric tower below installation, use.
 
11. The use of wire rope specifications, installing and strength must comply with the requirements of the tower, should with production manufacturers of technical documents for use basis.
 
12. Drum of wire rope hooked on firm, the orderly rows. Release wire rope, rolling at least to keep three laps on above.
 
13. The wire rope knot solid pick, compiled by length shall not small diameter steel strings of 20 times, not a short at 0, 3 m, knitting in a part should strapping fine steel wire.
 
14. The rope card wire rope solid pick, quantity shall not be less than three, the last one shall not be less than the head from yumco rope 0, 14 m. Rope card should be in force on one side of the plywood "U" shaped bolts should be at the wire rope, and shall not be positive and negative cross. Bands should be tightened to make two rope height diameter crushed by 1/3. Fixed rope card, to force should be tightened after wire rope again. Rope card matching table:
 
15. Conduct tower, and turn to lift hook, derricking and walk until the action before, should sound, sighing.
 
16. Homework, operators and command staff must be close cooperation. The command crew must be familiar with the performance of the command tower, the operating personnel should strictly carry out the command signals, such as the signal is not clear or error, the operator can refuse to carry out.
 
17. Homework, weight to stay below a personnel or through, it is strictly prohibited to use tower hoisting the personnel.
 
18. Operators must follow a prescribed lifting performance homework, the prohibition opens the crane hoisting and limit overload things unknown the weight of the object.
 
19. It is strictly prohibited to installing inclined condole with cables, hoisting and embedding objects or underground condensed in the weight on the ground. The scene of the pouring concrete component or template, must all loose before operation.
 
20. The ascension and landing speed should be installing and even, turn around should be stable. It is strictly prohibited to fast and slow down and sudden braking. When rotary not stop when the firm, and shall not do reverse action.
 
21. It full load or close to full load tower, should first will lift the heavy ground 200 ~ 500 mm downtime, check the stability of the tower, the reliability of the brake, clog the soundness of the stability and binding. Check and correct, it continued.
 
22. It should be bound and heavy firm, ensure stable, is likely to a weight of shaking, should be tied to pull the rope. Don't allow the single point hanging objects. Not in the things it pile up on or suspension is sporadic objects. Position or the mark with binding objects should be according to the position or mark binding, and binding sling with objects not less than 30 degree Angle.
 
23. Hanging things, short and long material should be separate, small material should use boxes.
 
24. In the rain and snow day work, try to hang, sensitive and reliable proof brake, conducted only after work. If the above six winds or heavy rain, heavy snow, the heavy fog wait until bad weather when, should stop installing outdoor homework.
 
25. Each work in the future, deal with wire rope all visible parts and the wire rope connection parts for inspection. Wire rope surface wear or corrosion make its nominal diameter reduced by 7%, or in the length of the provisions in the number of broken wire to the following standards, should change in time:
 
26. The homework, hook to cap a tower, the car to collect into, joystick at zero, cut off the power supply, close behind the doors and Windows. Rail type tower should be open to track the central park, and clip clamps tight in the railway track.
 
27. Homework stopped to rest, don't allow objects hanging in the air.